Wood Window Replacement for Santa Monica homes — craftsman, modern coastal. All-in pricing: $1,800–$3,300. Permit pulled, Title 24 filed, lifetime install warranty. Free 48-hour quote.
Santa Monica's craftsman, modern coastal housing stock shapes how we approach every wood window replacement project here. The all-in pricing band for Santa Monica is $1,800–$3,300 — reflecting the higher-cost (1.18× baseline) labor and logistics costs for this market. For historic homes in Pasadena, Los Feliz, or Highland Park, vinyl is often the wrong answer — not because of performance, but because HPOZ design boards require that visible profiles match the original. Santa Monica Building & Safety runs 2–3 weeks. We file the permit and CF1R/CF2R energy documentation as soon as we have the signed contract, so the permit is moving while your materials are being fabricated. This market also involves coastal zone — all handled by Red Stag as part of the project, at no extra charge.
Solid wood windows in coastal locations require annual refinishing to prevent checking, warping, and rot at the sill. Andersen clad-wood — aluminum exterior, wood interior — is the correct long-term spec for homes within two miles of the coast. The aluminum exterior handles salt air without maintenance; the wood interior delivers the aesthetic. Marvin Ultimate clad for projects requiring maximum customization.
Coastal zone and seismic zone D. ADU and multifamily stock is common here. Salt-air framing spec on all exterior work. For wood window replacement projects specifically, Santa Monica homeowners most often ask about coastal zone compliance, scheduling around occupancy, and whether the old unit removal is included. The answer to the last question is always yes — we haul everything away same day. For the all-in pricing band of $1,800–$3,300, you get labor, materials, permit, Title 24 documentation, flashing, interior and exterior finish work, and a lifetime install warranty. Nothing is added later.
Santa Monica Building & Safety, 2–3 weeks. Red Stag pulls the permit, files Title 24 CF1R/CF2R energy documentation, and meets the inspector. Additional items handled: Coastal zone compliance documentation. The permit cost is included in your fixed quote — it is not added later.
Free walkthrough, fixed price in 48 hours. No deposit until materials are on-site.
Get my 48-hour quote